Victory Resources News
Reforma Sampling Results of 231 g/tonne of Silver, 14.12% Zinc
Thursday, 09 August 2012 00:00
VANCOUVER, BC – Victory Resources Corp. (the "Company") is pleased to announce the initial results on their ongoing underground work program conducted on the Company’s La Reforma property located north of Choix, Sinaloa State, Mexico.

The results of initial underground sampling at the La Reforma project have been received. The samples were collected from channels cut across vein material in skarn at the 690 level. From 29 samples taken along the drift over a length of 80 metres show...
Read more...
 
Victory Resources Corp. Update on the Work Program on the Reforma Property
Friday, 03 August 2012 00:00
VANCOUVER, BC – Victory Resources Corp. (the "Company") is pleased to provide an update on the current drill program on the Reforma property. 

The most recent drill hole on the La Reforma that encountered significant mineralization was RDH 11 which intersected a zone from 198.12m to 207.87m of galena, sphalerite and chalcopyrite in skarn. Drill core samples were sent to ALS Chemex in Hermosillo, Mexico for analysis. 

The current surface drill program is to explore for geological...
Read more...
 
Victory Resources Corp. Completes the Transaction for the El Boleo Property
Thursday, 12 July 2012 00:00
VANCOUVER, BC – Victory Resources Corp. (the "Company") is pleased to announce that it has completed the acquisition of the El Boleo property from Minera Copper Canyon S.A. de C.V. (“Minera”) a private Mexican corporation. The transaction will allow the Company to acquire up to a 100% interest in El Boleo which is located adjacent to the historic Reforma Mine, the Santo Tomas Copper-Gold deposit, and in close proximity to the Bahuerachi Copper Deposit. 

The Boleo property is...
Read more...
 
Victory Resources Corp. Completes the Drill Program on the Tailings Pond
Tuesday, 03 July 2012 00:00
VANCOUVER, BC – Victory Resources Corp. (Symbol VR-TSXV, OTCQX: VRCFF) (the "Company") is pleased to announce that it has completed the 2nd and final stage of the drill program at the Altamira tailings pond located at the Reforma mine.

The drill program was conducted on two tailings ponds known as the Matanza and the Altamira. The drill program completed on the Matanza tailings pond consisted of 46 drill holes with depths ranging from 2 meters to 10.9 meters for a total of 291 meters. The...
Read more...
 
Victory Resources Corp Announces $5 Million Financing Commitment
Thursday, 28 June 2012 00:00
VANCOUVER, June 28, 2012 /CNW/ - Victory Resources Corp. (Symbol VR-TSXV, OTCQX:VRCFF) (the "Company") is pleased to announce that it has entered into an agreement with GEM Global Yield Fund Limited ("GEM") for a $5.0 million CDN financing commitment. Funds raised through this facility will be used for the ongoing drill program and the subsequent engineering work to bring the Reforma mine to feasibility. Funds will also be used for the development of the Company's recently optioned Boleo...
Read more...
 
<< Start < Prev 11 12 13 14 15 16 17 18 19 20 Next > End >>

Page 11 of 20